RMG industry · Garments ERP

One buyer order, end to end.

Scroll to walk the factory. One example order, 2,400 pieces, followed from the goods receipt through cutting, sewing, final inspection and packing, to the shipment that leaves by sea or by air. Every step sits on one record in the garment ERP we build for apparel factories wherever garments are made.

Advise · Build · SupportGarments ERP, international
Ground floor · 01 · Store

Received, inspected, banded by shade.

Rolls arrive at the store. Posting the goods receipt note creates every roll and lot, material inspection is sampled to an AQL plan, and rolls are banded into shade groups. Requisitions are approved and issued at the issue desk, every movement lands on one stock ledger, and the bond register is derived from that same ledger.

38rolls on the GRN
1 ledgerstock and bond agree
Ground floor · 02 · Cutting

Planned, laid, cut and bundled.

Cutting starts only from a plan released to production. There is a cut order per style, a marker from the library, and lays planned by shade group with their plies and rolls. Counted outputs are confirmed, consumption posts to the ledger roll by roll, and every bundle gets a QR bundle card before it rides the goods lift.

80 plieson this lay
96bundle cards printed
Floor 1 · 03 · Sewing lines 1–6

Scanned in, scanned out.

A line supervisor opens a scan station for the shift and scans bundle cards in and out at each scan point, even when the network drops. Line WIP shows what is in, out, rejected, waiting and on hold, operation by operation. The daily production report works out line efficiency against SMV or a pieces-per-hour target, with the basis always shown.

6 lineson this floor
Offline-safescans queue and sync on reconnect
Floor 2 · 04 · Sewing lines 7–11

Checked on the line, kept running.

Five more lines on the floor above. Roving QC scans a bundle, records defects against a defect-code list in the factory’s own languages and closes the round pass or fail to rework, so DHU and the line traffic light come from real checks. Maintenance keeps the machine register, PM plans, breakdown work orders and downtime, and the needle control register records each broken-needle event.

DHUby line, from recorded checks
Needle controleach broken-needle event logged
Floor 3 · 05 · Final inspection

Sampled by the table, never by guesswork.

Semi-final audit and final inspection work from inspection lots. The sample size and the accept and reject numbers are computed from lot size, inspection level and AQL, never typed, and a named QC user finalises the verdict. Needle control register entries and metal detection results are recorded against the lot.

125sample size for this lot
Ac 7 / Re 8at AQL 2.5
Floor 3 · 06 · Packing

Packed to the instruction, carton by carton.

A packing instruction per order sets the pack type and the ratio. Cartons are closed with their actual contents and their gross and net weights, an SSCC is allocated where the buyer’s label template requires one, and the packing list is generated from what is really in each carton.

120cartons closed
Actualcontents, never assumed
Ground floor · 07 · Handover

Assigned, finalised, handed over.

Closed cartons are scanned onto a shipment and the shipment is finalised. The commercial invoice and the packing list come from the same records, on the company’s letterhead. Handover at the gate records the truck, the delivery challan and the gate pass, and cut-to-ship reconciliation shows where every piece went: shipped, a named loss, or unexplained.

Ex-factorydate tracked per delivery
Cut to shipshipped, lost or unexplained
Sea port · 08 · By sea

On board, by sea.

From the gate the lorry runs to the port and the container goes onto the ship. The shipment record carries its mode, the vessel, the container and seal, the forwarder and the BL number, through to the on-board date.

Sea · Airone shipment record
BLnumber and on-board date
Air cargo · 09 · By air

Or by air, on the same record.

Urgent cartons go to the air-cargo terminal instead, and the shipment carries the flight and the AWB number. Commercial follows the paper behind both: the master LC and its back-to-back LCs, the utilisation declaration, the EXP number, submission to the bank and realisation of the proceeds.

AWBflight and air waybill kept
Realisationproceeds recorded on the invoice
Every stage, one system

From the goods receipt to the realisation, the whole order on one record.

This is the garment ERP software we built for RMG factories and run for apparel makers anywhere: commercial, planning, store, production, quality, packing, shipping and accounts on one record, in more than one language.

What the garments ERP covers
  • Merchandising & ordersOrder book, size matrix, deliveries, TNA; buyer PO intake from Excel, or from PDF and Word read by AI and checked by a person
  • Styles, BOM & costingVersioned BOM and routing with SMV; quotation, planned and actual cost with variance
  • PlanningLine board, capacity and load, release to production
  • Sourcing & commercialSupplier POs and proforma invoices, master and back-to-back LCs, UD, realisation
  • Store & bond registerGRN, rolls and shade groups, requisitions, issue desk, stock ledger
  • CuttingCut orders, markers, lays, bundles and QR bundle cards
  • Shopfloor trackingScan stations, line WIP by operation, daily efficiency on SMV or target
  • QualityFive QC stages, AQL sampling, defect codes, DHU
  • Packing & shippingPacking instructions, cartons, SSCC, packing list, shipments by sea or air
  • Billing & accountsExport invoices, proceeds, supplier bills, chart of accounts and journals
  • Compliance & maintenanceAudits and CAPA, training and chemical registers, PM plans, work orders, needle control
  • HR & payrollEmployees, attendance, leave, monthly payroll runs
Choosing a system

What to look for in a garment ERP.

Seven things a factory manager can check when comparing garment ERP software, whichever system is on the table.

  • Order to shipment on one recordCan you follow one buyer order from the PO through cutting, sewing, packing and the ship or aircraft without typing it in again?
  • Buyer and style recordsBuyers, styles, size matrices, BOMs and costing kept together and versioned, so a repeat order starts from last time
  • Production by stageCutting, sewing and finishing recorded as they happen, by line and by operation, not typed up at the end of the shift
  • Inventory and fabricRolls, shades, trims and consumption on one stock ledger, with the bond register derived from it rather than kept apart
  • Shipping by sea or airVessel, container, BL, flight and AWB on the same shipment record as the packing list and the invoice
  • VAT and export paperworkThe returns your tax office asks for, in the local VAT form, and the LC, UD and EXP records behind each export
  • Who owns the dataYour records stay yours, can be exported in plain formats, and the system can run in your own environment if you want it to

A generic accounting ERP starts from the ledger and treats a garment as a line item. A garment ERP starts from the buyer order and the style, follows cut pieces and bundles through the floors, and only then posts the money. That is why the packing list, the cut-to-ship reconciliation and the export paperwork come out of the same records instead of being rebuilt in spreadsheets.

  • Cut-to-ship reconciliation
  • Role-based desks
  • Smart Inbox document reading
  • More than one language

The order, quantities and figures on this page are an example, shown to explain the system; they are not a customer’s results.

Talk to us